QHD32-6 FPSO marine transportation and hoisting
To save gas consumption, QHD32-6 oil field FPSO "Bohai Century" was in need of renovation to increase gas turbine project. The integrity of the removal of hot oil boiler FPSO-B-901D (HEATING MEDIUM BOILER), new dual-fuel turbine generators SOLAR Taurus 70 (ISO power 7500kW); gas compressor skid (FPSO-X-201A / B); Gas processing skid; battery room. My company takes over the transport and marine hoisting. April 10, 2010 hanging of goods shipped by the Tianjin Xingang Shipyard dock, boat storage project reaches Qinhuangdao 32-6 FPSO berthing area, the total range of 70 sea miles. Shared transport and lifting operations when the 12 days the whole time.
Lifting sequence |
Device Name |
Number |
Size / m |
Weight/ t |
Distance from the ship / m |
1 |
4 # boiler (with stand) |
1件 |
8.4565*4*4.6 |
70 |
7.05(距右舷) |
2 |
Waste heat recovery boiler |
1Pieces |
5.805*3.36*4.082 |
35 |
13.36(From the starboard) |
3 |
Battery room |
1Pieces |
3*2.4*3 |
8.5 |
7.36(From the starboard) |
4 |
chimney base |
1Pieces |
3.4*3.4*1.558 |
12 |
2.53(From the starboard) |
5 |
Chimney silencer |
|
2.57*2.9*7.32 |
8.5 |
2.53(From the starboard) |
6 |
pry turbine generator |
|
11.841*6.25*4.84 |
76 |
7.05(From the starboard) |
7 |
maintenance platform |
|
8.2*5.2*10 |
15 |
2.8(From the starboard) |
8 |
turbine inlet filter housing |
|
4.72*3.74*3.05 |
5.7 |
2.8(From the starboard) |
9 |
Gas compressor skid |
|
22*11.015*5 |
120 |
5(From the port side) |
10 |
gas processing skid |
|
11*8.2*8.2 |
68 |
5.5(From the port side) |
|