15. ZHUHAI JUTAL Water Bath Heater FROM ZHUHAI TO HONGKONG.
14. RHI EXPORT STEEL STRUCTURE
13. Rotating Deck 1pcs 908,000kgs 12476.88m³(25.8x26x18.6)
Boom 1pcs 300,000kgs 9757.44m³(92.4x12x8.8)
A-frame 1pcs 150,000kgs 2442.24m³(32x10.6x7.2)
12. SPM/FROM PENGLAI JUTAO TO SHANHAIGUAN SHIPYARD
11.
Hydraulic Anchor Windlass/Mooring Winch
DIMENSION (L×W×H):3.7×2.1×2.1M WEIGHT:7 TONS
10. MUD MODULE
DIMENSION (L×W×H):17.5×20×9M WEIGHT:310 TONS
9. TRANSPORTATION AND OFFLOADING FOR COSL PLATFORM PROJECT
SITE:YANTAI,CHINA
OWNER:National Oilwell Varco
DATE:2007/7
Drilling machine/2528.755Tons/480 package
8. LAUNCHING AND LOADOUT /SEAFASTIN FOR SSP300 FPSO PROJECT
OWNER:SEVERN MARINE
DIMENSION (L×W×H):66×66×27M WEIGHT:10389 TONS
7. IMPORT WIRE ROPE FOR HHMC
3120mm*3050mm*2460mm 39T×2PCS
3120mm*3050mm*2460mm 40T×2PCS
4130mm*4600mm*3297mm 88T×4PCS
6. LIFTING TURBINE & PARTS FOR COOEC
5. Vacuum Deaerator Vessel 26 X 3.7 x 3.9M 37000Kgs
4. BOOST PUMP MODULE from Dalian port to COSCO(Dalian) 14×10.4×8.9m
270T



3. ZHUHAI JUTAL OFFSHORE OIL SERVICES LTD.
J800 & J801







2. QHD32-6 FPSO marine transportation and hoisting
To save gas consumption, QHD32-6 oil field FPSO "Bohai Century" was in need of renovation to increase gas turbine project. The integrity of the removal of hot oil boiler FPSO-B-901D (HEATING MEDIUM BOILER), new dual-fuel turbine generators SOLAR Taurus 70 (ISO power 7500kW); gas compressor skid (FPSO-X-201A / B); Gas processing skid; battery room.
My company takes over the transport and marine hoisting. April 10, 2010 hanging of goods shipped by the Tianjin Xingang Shipyard dock, boat storage project reaches Qinhuangdao 32-6 FPSO berthing area, the total range of 70 sea miles. Shared transport and lifting operations when the 12 days the whole time.
Lifting sequence |
Device Name |
Number |
Size / m |
Weight/ t |
Distance from the ship / m |
1 |
4 # boiler (with stand) |
1件 |
8.4565*4*4.6 |
70 |
7.05(距右舷) |
2 |
Waste heat recovery boiler |
1Pieces |
5.805*3.36*4.082 |
35 |
13.36(From the starboard) |
3 |
Battery room |
1Pieces |
3*2.4*3 |
8.5 |
7.36(From the starboard) |
4 |
chimney base |
1Pieces |
3.4*3.4*1.558 |
12 |
2.53(From the starboard) |
5 |
Chimney silencer |
|
2.57*2.9*7.32 |
8.5 |
2.53(From the starboard) |
6 |
pry turbine generator |
|
11.841*6.25*4.84 |
76 |
7.05(From the starboard) |
7 |
maintenance platform |
|
8.2*5.2*10 |
15 |
2.8(From the starboard) |
8 |
turbine inlet filter housing |
|
4.72*3.74*3.05 |
5.7 |
2.8(From the starboard) |
9 |
Gas compressor skid |
|
22*11.015*5 |
120 |
5(From the port side) |
10 |
gas processing skid |
|
11*8.2*8.2 |
68 |
5.5(From the port side) |
1. WARTSILA ENGINE
February 2009, commissioned to undertake the customer's generator WARTSILA lifting sea and land transport projects. Six marine generators from the port of Qingdao Huangdao ship by the floating crane barge directly from foreign trade to domestic trade vessels, each piece of cargo dimensions are 10.1 * 3.06 * 4.2 m, gross weight of nearly 100 tons / pieces. Lifting, lashing a fixed time in just 10 hours. Then the land transfer to the Yantai Raffles.